Working Hours Monday - Friday 08:00-16:00
Toll Free 1800.899.900

Corporate Profile

I take pride in preparatory of the prominent mechanical engineering solutions and construction firms in Bangladesh, having achieved remarkable growth over the years and contributing significantly to the development of National Infrastructure. The Reliable Builders & Reliable Machineries has attained prominence as a leader in the field of construction and engineering through competence, competitiveness and timely delivery with highest quality standards and recognized safety performance. We have a long tradition of serving our valued customers to their complete satisfaction through efficient management and excellent workmanship, which we continue to maintain with our untiring efforts. Our Organization is also ISO Certified. ISO number is 110583 (9001:2015).

In an era of advanced technologies and new techniques, we continuously strive for innovation and enhanced efficiency.

Offering services spanning a wide range of engineering fields in oil & gas, sewage systems, marine structures, building constructions, power & water, roads & bridges and industrial and civil infrastructure, RBL is the preferred choice of many clients because of its reliability and commitment to quality and safety.

Due to strong background in Mechanical Engineering Solutions & design, has been able to succeed in the projects by prioritizing our engineering notion. Whereby, the “corporate synergy” built together with our mother company OTBL and Partnership Corporation (DEWL) had a major contribution on our success. We never failed to realize that our efficient structure has always been the most significant anchorage for our Clients. As we look to the years ahead we renew our pledge to remain committed to excellence, keep abreast of changes and innovations, adopt better management and construction techniques and successfully overcome all challenges before us.


Shafiqul Alam Mithun
Managing Director
Reliable Builders Ltd.

ISO Certificate

Message of Founder

Shafiul Alam Mithun



Within a short span of time, The Reliable Builders has not only been able to establish itself as a leading Civil Engineering contractor & related Equipment Service Provider in wide ranged organized sector, but also has earmarked its presence in other business with a strong support of its sister concerns.

Today it is very satisfying to see a dedicated & resolute team stride proudly towards building our National Infrastructure with our asset deployed at every corner of the country.

My compliment goes to the leadership for imbibing an exemplary service culture and winning customers confidence and loyalty. With its unique proposition, I hope to see The Reliable Builders spreading its wings globally under various business opportunities.



Shafiqul Alam Mithun
Managing Director
Reliable Builders Ltd.



MISSION:
Our mission has been focused on creating an Industrial Group active in multiple sectors which are diverse but key to the country’s grouth.
VISSION:
To provice quality services that exceeds the expectations of our esteemed customers.

Mission & Vision

Mission:
With a well-defined direction in place, the path to realizing our Vision is based on fundamental drivers, instrumental in achieving our goals. Industrialization is a process that happens in countries when they start to use machines to do work that was once done by traditional labor. Industries are the most important aspect of the economy. Using better technology, it becomes possible to generate more possessions in a shorter amount of time. Sectors such as Agriculture, Energy, Transportation, Material Handling, Heavy Duty Machineries, Electric Appliances, Textile and etc; are the versatile parts of International Trading.

On the other hand, Road infrastructure is vital in assisting the Nation’s economic development by moving people and goods. Sectors such as Civil Construction particularly roads, buildings, airport, power and ports have become very attractive for both domestic and foreign contractor & investors. This is due to relatively low entry barriers in these markets, a strong project pipeline and a considerable opportunity size.

As a result, the market as a whole has become a mixed bag of opportunities in which different types of players are participating, concerning the common interest of doing business. Orienting towards market demand, THE RELIABLE BUILDERS (TRB) is the most imperative Sister Concerns of OTBL. Facing the new challenges and opportunities, TRB has emerged as a leading enterprise in Bangladesh in the field of Infrastructure construction & International trading of Industrial Machineries.

The Reliable Builders has been a key partner in the infrastructure growth of BANGLADESH, since the company’s founding TRB has explored & expanded to meet the needs of the region as the demands for improved infrastructure increase. As The Company grown, TRB has formed & pursue new partnerships and branched out to new subsidiaries to meet nearly every Industrial Machinery of Transportation, Construction, Material Handling, Marin, Textile, Agriculture & a wide variety of products.


Vision:
From being number one construction company in Bangladesh, TRB continues to excel in its entire field through its leadership skills. It makes its mark in South East Asia delivering projects that consistently meet international standards.

ACTIVITIES

The construction work involves earthworks, foundation works, piling and foundation reinforcement, tunneling and underground construction, harbor construction and dredging, municipal engineering, and the construction of streets, roads, bridges and Street light facilities etc. In infrastructure maintenance, our company is involved in up keeping roads, streets and the rail network, including related structures such as bridges. We offer long-term maintenance agreements where pricing is influenced by the usability of the route and service quality.

RM will continue on its path of pursuing growth in high margin growth oriented sectors, particularly in the Industrial Machinery regarding Construction, Agriculture, Material Handling & Vehicles and power sectors where a supply capacity crunch is anticipated with the pressures brought on by the rise in regional demand. We have earmarked a strong focus on improving client service and relations, as well as increase investment and empower high margin businesses to drive sustainable and long term growth.

To procure projects at competitive pricing, provide safe working condition and deliver quality work within reasonable time frame the advantages of hiring TRB for your special projects include:

• Single point of contact for all aspects of civil construction
• Rapid response and mobilization
• Big-picture understanding of ongoing business environments
• Well-defined scopes of work
• Quick response to change
• 100% Quality

Selected areas where RM can help:

• Product profitability: Striking the right balance across go-to-market strategy, option profitability, cost structure, discount strategy, and product mix.
• Global launches: Effectively launching the same platform or product in multiple regions through a combination of local and global suppliers.
• Cost engineering: Delivering both value and insight in the face of the dual challenges of elaborate global complexity and low volumes.
• Relationships between suppliers and original equipment manufacturers: Targeting and executing the right mix of local and global relationships to jointly develop and profitably deliver products globally.
• Technical cost reduction: Implementing major programs across geographies to reduce direct material costs on current products.
• Functional assessments and redesign: Assessing organizations’ current capabilities and developing road maps to sustainably achieve best-in-class performance.

To us, “Excellence” means not only being the very best at what we do, but also holding ourselves to the highest ethical standards in terms of how we do things. That is why we must never deviate from our Business Principles, regardless of the difficulties or consequences. As we strive for Excellence, we must continue to earn the trust of our customers, employees, local communities and co-workers by continuously demonstrating that we are worthy of the trust that they have placed in us.

Organization Chart

Working Department

  • Roads and Highways Department (RHD)

  • Local Government Engineering Department (LGED)

  • Civil Aviation Authority of Bangladesh (CAAB)
  • Bangladesh Navy (BN)

  • Rajdhani Unnayan Kartipokkha (RAJUK)

  • Bangladesh Economic Zones Authority (BEZA)

Financial Capability

The ability to successfully cash manage a project is vital to its success. Through our substantial construction experience we have developed our job costing and control systems to accurately monitor the overlay company cash management and the specific cash management of each project.

The Reliable Builders has recently upgraded to the suite of construction accounting packages this now provides even more accurate and detailed financial management of specific projects and client requirements, as well as more information on the overall company performance. According to the need of the clients we provide primavera or MS project-project planning and control software.

The Reliable Builders operates very significant trade accounts with Bangladesh’s leading suppliers and subcontractors. We have proven that we have the financial capacity to complete any project that we choose to engage in. with the company entering its 20th year of operations and with an annual turnover approaching higher growth The Reliable Builders has created the base for long term success in the Bangladesh Construction Industry. Banking facilities more than 300 Cr. Taka shows Trust in our financial strength and objectivity and delivery capabilities.



SL. No. Financial Year Turnover (Taka)
1. 2007-2008 850,223,280.75
2. 2008-2009 1,393,593,284.38
3. 2009-2010 967,966,535.91
4. 2010-2011 1,630,101,164.47
5. 2011-2012 1,455,348,659.42
6. 2012-2013 2,051,420,221.00
7. 2013-2014 1,725,526,732.19
8. 2014-2015 3,300,033,803.17
9. 2015-2016 2,570,893,419.82
10. 2016-2017 3,883,782,916.11
11. 2017-2018 3,954,954,406.48
12. 2018-2019 3,123,782,916.11
13. 2019-2020 3,954,954,406.48
14. 2020-2021 4,531,300,516.25
15. 2021-2022 5,425,273,800.00
16. 2022-2023 6,528,623,222.00
Total: 47,347,779,284.54


Personnel Mejor

SL No. Name Designation Technical Qualification Experience
1. Md. Sazzad Kadir Khan Project Director B.Sc. Engineer (Civil) 20 Years
2. Md. Abu Sayed Project Director B.Sc. Engineer( Civil) 22 Years
3. Md. Sayed Kader Executive Director B.Sc. Engineer (Civil) 17 Years
4. Mr. Samir Kumar Paul Project Manager B.Sc. Engineer (Civil) 17 Years
5. Mr. Korban Ali Project Manager B.Sc. Engineer (Civil) 16 Years
6. Md.Abu Sayed Project Manager B.Sc. Engineer (Civil) 17 Years
7. Md. Monirul Islam Project Manager B.Sc. Engineer (Civil) 15 Years
8. S. M. Rabib Shahriar Project Engineer B.Sc. Engineer (Civil) 5 Years
9. Md. Azizul Haque Field Engineer Diploma Engineer (Mech.) 28 Years
10. Md. Shuvon Deputy Project Manager Diploma Engineer (Civil) 8 Years
11. Md. Ariful Islam Arif Asst. Project Manager B.Sc. Engineer (Civil) 19 Years
12. Md. Morshedul Alam Asst. Project Manager B.Sc. Engineer (Civil) 16 Years
13. Md. Fazlul Karim Field Engineer B.Sc. Engineer (Civil) 15 Years
14. Md. Obaidul Haque Field Engineer Diploma Engineer (Civil) 14 Years
15. Engr. Chowdhory Iftekhar Field Engineer Diploma Engineer (Civil) 07 Years
16. Md. Jahagir Alam Field Engineer Diploma Engineer (Civil) 06 Years
17. Md.Ariful Islam Sagor Field Engineer Diploma Engineer (Civil) 06 Years
18. Mr. Bimal Debnath Chief Accountant M.Com 25 Years
19. Mr. Rezaul Karim DGM Accountant M.Com 20 Years
20. Abu Talha Accountant BBA, MBA 8 Years
21. Md. Sazzad Hossain Chief Accountant M.Com 25 Years
22. Md. Abdul Mannan Sr. Accountant M.Com 15 Years
23. Md. Alauddin Accountant M.Com 09 Years
24. Md. Kamruzzaman Sr. Accountant M.Com 10 Years
25. Md. Rafiqul Islam Accountant M.Com 05 Years
26. Babul Biswash Accountant M.Com 10 Years
27. Md. Shahajalal Accountant BBA 3 Years
28. Mr. Jahangir Alam Accountant M.Com 10 Years
29. Md Safi Ullah Accountant M.Com 10 Years
30. Md. Shohel Accountant BBA 10 Years
31. Rofiqul Islam Shahin Accountant BBA 08 Years
32. Md. Omer Faruk Accountant BBA 05
33. Md. Mamun Accountant BBA 05 Years
34. Muhammad Firoz Khan General Manager (Marketing) BBA 10 Years
35. Md. Rezaul Kabir Sr. Commercial officer B.Com 12 Years
36. Md. Faisal Ahmed Commercial Officer MBA 12 Years
37. Litu Kar IT In Charge Diploma in Computer 12 Years
38. Md. Raqibuzzaman (Raqib) Sr. Computer Operator B.A. 07 Years

Works In Hand

SL Name of the Work
1. Construction of New Flexible Pavement at Ch. 2+100m to 5+200m at Borotakia (Abu Torab) - Mirsarai Economic Zone Connecting Road
2. Re-Construction of Flexible Pavement at Ch.0+000m to 2+100m & Ch.5+200m to 10+000m at Borotakia (Abu Torab) - Mirsarai Economic Zone Connecting Road
3. Widening, Strengthening, Surfacing, RCC Culvert & Protective work at 14th Km (P) to 31th Km of Mowna-Fulbaria-Kaliakoir-Dhamrai-Nobinagor (Dulivita) Road (R-315) under Gazipur Road Division during the year 2018-2019 (W4-04).
4. Widenging of Road Embankment (Earth Work) New Construction, Widening of Pavement (2x0.90m), Strengthening of Existing Pavement (3.7m), Surfacing (DBS Wearing Course 5.5), Construction of 8 Nos RCC Box Culvert, Protective Work, Road Sign, Km Post & Road Marking from Ch. 50+126 to Ch. 74+355 of (Rajapur-Kathalia-Amua-Bamna-Patharghata)(Z-8708) Under Barguna Road Division during the Year 2018-2019.
5. Widening of Pavement including Earthwork, construction of Hard Shoulder, Strengthening, Reconstrcution, Surfacing & Protective work from Ch.86+872 k.m to Ch.116+385 of Mymensingh(Raghurampur)-Kishoregonj(Battali)-Bhairab(bazar) Road (R360) under Road Division Kishoreganj during the year 2017-2018.(Package WP-07).
6. Widening, Surfacing Construction of Round-About and Road Divider at 21st(p), 22nd(p), 24th(p), 25th(p) (At Nischinta Bazar), 29th(p) (At Bottoli), 35th(p), 36th & 37th(p) (At Joypurhat Town area) Km of Bogura (Mokamtola)-Kalai- Joypurhat (Joypurhat portion) Road (R-550) under Road Division, Joypurhat during the year 2019-2020. Package No. WP-12
7. Completion of incomplete works i.e. Earthwork, Widening, strengthening, Surfaqing (7.30m) and Rigid Pavement, Sign/Signal, KM post, Road Marking & Road Divider Work at Ch. 26+420 km to 36+840 km of Bogra (Mokamtola)-Kalai-Joypurhat (Joypurhat portion) Road (R-550) under Road Division, Joypurhat during the year 2021-2022. Package No.WP-08(a)
8. Widening of Road Embankment and Pavement including Strengthening, Dense Bituminous Surfacing, Rigid Pavement, R.C.C. Box Culvert, Protective work etc. from Ch.32+300 km to Ch.47+130 of Modhupur - Mymensingh National Highway (N-401) and New Construction of Flexible Pavement from Ch. 3+000 km to Ch. 6+000 of Muktagacha Link Road under Mymensingh (ADP) Road Division during the year 2021-2022. (WP-03)
9. Pavement Widening, Strengthening, Earthwork, Protective work, R.C.C Box Culvert Construction, Drain construction, Road Marking, Sign-Signal etc work at 8th(P) km to 17th(P) km (Ch.07+000 to 16+885) under Raising of Road Embankment with Pavement Reconstruction & Widening at Singra portion of Singra-Gurudaspur- Chatmohor (Z-5209) Road Project under Road Division, Natore (ADP) during the year 2020-2021. (WP-2)
10. Widening of Road Embankment and Pavement including Strengthening, Dense Bituminous Surfacing, Rigid pavement, RCC Box Culvert, Protective work etc. from Ch. 14+970 to 28+300 of Modhupur-Mymensingh National Highway (N-401) and New Construction of Flexible Pavement from Ch. 0+000 to 3+000 of Muktagacha Link Road under Mymensingh Road Division during the year 2021-2022. (WP-02)
11. Construction of Approach & Internal Road of Jamalpur Economic Zone under Jamalpur Road division during the year 2020-2021.
12. Improvement of Itakhola-Mothkhola-Katiadi Road (R-211) to Proper Standard from Ch. 0+000m to 16+000m by Earthwork in road Embankment, Widening, Strenthening, Re-Construction of 6 Nos Culvert, Widening of existing 13 Nos Culvert, Construction of Service Road, Construction of 4 Nos Underpass and Bituminous Surfacing work with necessary Sign signal, Road Marking, Protective work under Narsingdi Road Division [WP- 01]
13. Improvement of Ghonapara to Mausoleum of the Father of the Nation Bangabandhu Sheikh Mujibur Rahman (including Sheikh Lutfar Rahman Bridge Approach) Road to appropriate standard and width from Ch.37+626 to Ch.41+600 and Surfacing works from Ch.36+833 to Ch.37+626 of Z-7704 road, from Ch.00+000 to Ch.02+050 of Z-8429 road, from Ch.00+000 to Ch.00+600 of Z-8507 road, VIP Parking 35.0m, Rehabilitation from Ch.00+000 to Ch.01+450 of Z-8504 road including Construction of 2.0 Nos.(24.0m) new culvert., Extension of 1.0 No.(10.10m) culvert , 1817.0m Retaining wall, Intersection, 1.0 No. Parking zone, 3.0 Nos. Bus Bay & other ancillary Works under Road Division Gopalgonj during the year 2022-2023. (Package No.WP-02)

Complete Project

Sl No. Description of Works
1. Name of contract : Up grading of Lalpur Upazila Health Complex from 31 bed to 50 bed at Natore. Procuring Entity : CMMU, Rajshahi Zone
2. Name of Contract : Construction of 500 seated Auditorium Building at Govt. Laboratory High School under Dhanmondi Thana, Dhaka. Procuring Entity: Education Engineering Department, Dhaka.
3. Name of Contract: The Civil Construction work of 2nd phase/expansion of China Bangla Ceramic Industries Ltd. Rupgonj, Naraynganj. Procuring Entity: China Bangla Ceramic Ind., Narayangonj.
4. Name of Contract : Construction of Students Hostel and Residential Quarter in/c associates works at Dental College, Mirpur, Dhaka Procuring Entity: CMMU, Dhaka.
5. Name of Contract : Construction of General Gallery of Natore District Stadium" under the project for construction of 8 District Stadium (Group 2) Procuring Entity: National Sports Council, Dhaka.
6. Name of Contract: Modaffargonj-Chitoshi-Ramgonj Road (Km.0.00 to Km 9.00) Emergency Flood Damage Rehabilitation Project. Procuring Entity : RHD, Laxmipur
7. Name of Contract: Gouripur-Kachua-Hajigonj-Feni Road (Km. 0.00 to Km. 10.00) Emergency Flood Damage Rehabilitation Project. Procuring Entity : RHD, Comilla
8. Road:- Kushtia (Bottail) - Poradhah - Alamdanga - Chuadanga Road.
9. Widening of Pavement (Charfasion bazar area) with Carpeting and seal coat from Chainage 0+900 to 1+255 Km of Carfassion-Charmanika-Baburhat Launchghat Regional Highways under Road Division Bhola during the Fiscal year 2010-2011.
10. Widening of Pavement with Carpeting and seal coat from Chainage 34+000 to 36+000 Km of Carfassion-Charmanika-Baburhat Launchghat Regional Highways under Road Division Bhola during the Fiscal year 2010-2011.
11. Road : N7 (Dauladia-Faridpur (Goalchamot) – Magura – Jhenaidah–Jessore – Khulna - Mongla(Digraj) Road) LRP 221+613 (Ch: 221.562) - LRPE = 30.478 km
12. Development and Construction of Lot-2 Works at Payra Seaport project, Kolapara, Patuakhali.
13. Dredging/Excavation in Tentulia River at char Banshbaria, Patuakhali for BADC Beej Bordhan Khamar Project.
14. Emergency raising of Pavement in front of Padma Bridge Rehabilitation Project at 43rd Km(P) of Fatullah-Mushigonj-Lauhajong-Mawa road under Munshigonj Road Division during the year 2012-2013.
15. (i) Bhola (Porantalukderhat)- Borhanuddin-Lalmohon-Charfassion- Charmanik Road (R-890) LRP 10+449 (Ch.10.30)-LRP011+456 (Ch.11.30), LRP016+516 (Ch.16.400)- LRP 017+697 (Ch. 17.600), LRPS+000 (Ch.0.00)- LRP 004+1191 (Ch. 5.00) (ii) Rahmatpur-Bahugonj-Muladi-Hizla Road (Z-8034) LRP 014+163 (Ch. 15.00) LRP- 018+761 (Ch. 19.60) & LRP023 +2907 (Ch.27.00)-LRP 023+9107 (Ch. 33.200).
16. Work: Repair and Restoration by Overlay work from LRPS to LRP 010 (at 4th km(p), 5th km, 6th km(p), 7th km(p), 8th km, 11th km to 15th km, 16th km(p), 17th km(p), 18th km to 21th km) of Kalampur Bus Stand-Kawalipara-Balia-Warsi-Mirzapur Road (Z-5061) of Manikgonj Road Division under Periodic Maintanance Program 2013-2014.
17. Work: Providing Overlay with Repairing & Earth work at(a) LRP018+761 (Ch: 19.600) - LRP021 +1744(Ch: 24.00), LRP023+907 (Ch:25.00) - LRP023 + 2907 (Ch: 27.000), LRP023+9107 (Ch: 33.200)-LRP023+11907(Ch: 36.000) & LRPS (Ch:0.000) - LRP007 + 663 (Ch: 7.700) of Rahamatpur – Babugonj – Muladi - Hizla Road (Z-8034) (b) Providing Strengthening, Surfacing, Earth work & Palisading work at LRP004+29(Ch: 4.000) to LRP009+3183(Ch:13.000) of Hizla-Mehendigonj - Barisal (Mehedigonj - Barisal) (Laharhat connecting road) (Z-8043) under Barisal Road Division during the year 2013-2014.
18. Work: Periodic Maintenance providing DBST & DBS-wearing course at Ch.120.280 to Ch.145.900 of Dhaka(Katchpur)- Bhairab- Jagodishpur- Shaistagonj-Sherpur-Sylhet-Tamabil – Jaflong Road (N-2) of Habiganj Road Division of Sylhet Zone, Sylhet under PMP, year 2013-2014.
19. Maintenance Dredging in Tentulia River at Char Bashbaria, Patuakhali.
20. Earth work , widening by flexible pavement & 40 mm DBS Wearing Course at different km of Barisal(Dinererpool)-Laximpasha-Dumki Road(Z-8044) under Barisal Road Division during the year 2014-2015.
21. Strengthening, Partial widening and Overlay work at 10th km (P) to 25th km (P) of Tongi-Kaligonj-Ghorashal-Pachdona road (R-301) & Widening with DBS wearing course at 22nd km (P) to 26th km (P) of Kapashia-Pabur-Fuldi-Kaligonj road (Z-3025) under Periodic Maintenance Program under Gazipur road division during the year 2014-2015.
22. PMP work with DBST(20mm followed by 10mm) at LRP189+827(Ch:188.486) to LRP203+708 (Ch:202.090) of Dhaka (Jatrabari)-Mawa-Bhanga-Barisal-Patuakhali Road (N-8) (Patuakhali Part) & At LRPS(Ch:0.000) to LRP025+4236 (Ch:29.200) of Patuakhali-Amtali-Barguna-Kacchira Road (R-880) under Patuakhali Road Division during the year 2015-2016.
23. Widening & Strengthening of Jamalpur-Islampur-Dewanganj Road under Jamalpur Road Division during the year 2015-2016
24. Construction of 588.0m long PC Girder Bridge over Modhumati river on Gopalgonj-Singati Upazila (Chapail Ferrighat) Road at ch. 2400m (ID No. 33532201) under Gopalgonj Sadar Upazila of Gopalgonj District.
25. PMP work with 40mm DBS Base Course, 30mm DBS Wearing course with Strengthening work of Barisal-Laharhat-Veduria-Bhola- Ilisha-Moju Chowdhurir Hat-Laxmipur National Highways (N-809) (Bhola Part) under Bhola Road Division during the year 2015-2016.
26. Improvement of District Road : Earth work, side widening, DBS wearing course at 19th (p) K.M. to 29th(p) K.M & Re-construction of Double vent & three vent straight R.C.C Box Culvert at 21st km & 23rd K.M, Construction of R.C.C Palisading, Sign Signal, K.M Post, Guide post & U-Drain of Faridpur-Charvadrasan-Sadarpur (Z-8402) Road under Faridpur Road Division during the year 2015-16. (WP-04).
27. Improvement of District Road : Earth work, side widening, Strengthening, Re-construction DBS wearing course at 1st K.M. to 7th(p) K.M & Re-construction of Double vent straight R.C.C Box Culvert at 4th K.M, Construction of R.C.C Palisading, Sign Signal, K.M Post, Guide post & Drain of Munshibazar -Hatgazaria Alternet(Z-8416) Road under Faridpur Road Division during the year 2015-16. (WP-05).
28. Construction of Jamalpur Town Bypass Road including Widening & Strengthening of Jamalpur-Islampur-Dewangonj Road from ch: 30+000 to ch: 39+000 under Road Division Jamalpur During the year 2015-2016.
29. DBST work including necessary repairing & Earthwork from LRP140a (CH. 139+700) (Joysree Bus stand) to LRP 151a (CH. 151+400) (Rahmatpur Bus Stand) of Dhaka(Jatrabari)- Mawa- Bhanga- Barisal- Patuakhali Road (N8) under Barisal Road Division during the year of 2016-2017.
30. Widening of pavement, Including Extension of RCC Box Culvert & Protective work at Ch: 173+600 KM to 192+600 KM of Dhaka (Jatrabari )- Mawa-Bhanga -Barisal-patuakhali Road (N-8 ) under Barisal Road Division During the Year 2015-2016.
31. Contract No: MZ(e-GP)-20/Dev(MC)/2016-2017, Tender ID: 88935.
Construction of Fexible Pavement and Slope Protection work of 10th (p) to 20th km with Sign Signal & Km Post, Road Marking etc of Shaymgonj-Jaria-Birishiri-Durgapur Road (Road No. Z-3704) under Netrakona Road Division During the year 2016-2017.
Contractor: RAB-RC (PVT) LTD & The Reliable Builders (JV)
32. Contract No: 01/e-GP/BZ/PMP/BARJHA/2018-2019, Tender ID: 217840.
(a) Surfacing work with DBS-Wearing Course and Earthwork at different location of Rahmatpur-Babugonj-Muladi-Hizla Road (Z-8034) under Barisal Road Division during the year 2018-2019 (b) DBST work at Ch. 167+358 to 169+358 Km. of Dhaka (Jatrabari)-Mawa-Bhanga-Barisal-Patuakhali National Highway (N-8) under Barisal Road Division during the year 2018-2019 (c) Repair of pavement by DBST work at 170th(p) km to 174th(p) km (Ch.169+358 to Ch.173+358) of Dhaka (Jatra bari)-Mawa-Bhanga-Barisal-Patuakhali National Highway (N-8) Road (Jhalokati portion) Through PMP under Jhalokati Road Division during the year 2018-2019.
Contractor: The Reliable Builders & RAB-RC (PVT) LTD & National Development Engineers Ltd. (JV)
33. Contract No: OTM/Dev/Doha/Ctg Zone/CZ-13/2015-2016
Curve straightening from Indrapool to Chakrashala of Dhaka-Ctg.-Cox's Bazar National H.way (N1) Pro. new align. with con. of 5.2 KM F.P., 14 Nos. Culvert at different size & 1 N0 4-lane PC Girder Bridge (1X37.92m) year 2015-2016.
Procuring Entity : RHD, Dohazari
Contractor: RAB-RC (PVT) LTD & The Reliable Builders (JV)
34. Contract No: MZ(e-GP)-08/PMP(Road)/2018-2019, Tender ID- 216553
Periodic Maintenance Programe Providing DBS-wearing course from LRP ch. 3+714 to 18+744 of Mymensingh-Kishorgonj-Bhairab Road (R-360) under Kishorgonj Road Division and ch. 62+000 to 69+000 of Mymensingh (DC Office) -Raghurampur-Netrakona -Mohanganj- Dharmapasha-Jamalganj-Sunamganj Road (R-370) under Netrokona Road Division during the year 2018-19.
35. Contract No: 2017-18/101-115294(IRIDP-2/JHN/DW-182), Tender ID- 115294
a) Improvement of Panti Gajipur Bottola-Adarsha Andulla Mosque road Chatkabaria village Noth side to Adarsha Andulia village end north portion road ch. 00-855m) & b) Construction of 02 Nos. 0.625m x 0.600m culvert at ch. 268m & 368 on the same road, Harinakunda.
36. Contract No: 2017-18/100-115290(IRIDP-2/JHN/MW-178), Tender ID- 115290
a) Improvement of Gajipr Bottola-Adarsha Andulia Mosque Road. Chatkabaria village north side to Adarsha Andulia village end North portion road (ch. 00m-855m & (b) Construction of 02 nos 0.625m x 0.600m Culvert at ch. 268 & 368m on the Same Road Harinakundu.
37. Contract No: MZ(e-GP)-19/Dev(MC)/2017-2018, Tender ID- 134974
Widening of Pavement including Earthwork, construction of Hard Shoulder, Strengthening, Reconstrcution, Surfacing & Protective work from Ch.86+872 k.m to Ch.116+385 of Mymensingh(Raghurampur)-Kishoregonj(Battali)-Bhairab (bazar) Road (R360) under Road Division Kishoreganj during the year 2017-2018.(Package WP-07).
38. Contract No: 20/e-GP/BZ/ADP/ZH/BARG/2018-2019, Tender ID- 220499
Widening of Road Embankment (Earth Work) New Construction, Widening of Pavement (2x0.90m), Strengthening of Existing Pavement (3.7m), Surfacing (DBS Wearing Course 5.5), Construction of 8 Nos RCC Box Culvert, Protective Work, Road Sign, Km Post & Road Marking from Ch. 50+126 to Ch. 74+355 of (Rajapur-Kathalia-Amua-Bamna-Patharghata) (Z-8708) Under Barguna Road Division During The Year 2018-2019.
39. Contract No: DZ(e-GP)/34-Contract/Dev/2018-2019 (TID-213509) (WP-04), Tender ID- 213509
Widening, Strengthening, Surfacing, RCC Culvert & Protective work at 14th Km (P) to 31th Km of Mowna-Fulbaria-Kaliakoir-Dhamrai-Nobinagor (Dulivita) Road (R-315) under Gazipur Road Division during the year 2018-2019 (WP-04)
40. Contract No: e-GP/SE/CTG/DEV/DIVCTG/02/2016-17, Tender ID- 89035
Re-Construction of Flexible Pavement at Ch.0+000m to 2+100m & Ch.5+200m to 10+000m at Borotakia (Abu Torab) - Mirsarai Economic Zone Connecting Road Under Chittagong Road Division During The Year 2016-2017
41. Contract No: e-GP/SE/CTG/DEV/DIVCTG/01/2016-1, Tender ID- 89332
Construction of New Flexible Pavement at Ch. 2+100m to 5+200m at Borotakia (Abu Torab) - Mirsarai Economic Zone Connecting Road Project Under Chittagong Road Division During The Year 2016-2017
42. Contract No: e-GP/SE/CTG/CRD/DEV/05/2019-2020, Tender ID- 387608
Construction of RCC Retaining Wall 1400.00 metre and RCC Box Culvert (3 Nos) 10.00 metre work at Borotakia (Abu Torab)-Mirsarai Economic Zone Connecting Road Under Chattogram Road Division during the year 2019-2020.(WP-04)
43. Contract No: DZ(e-GP)/05-Contract/PMP(Road)/2020-2021(TID-494896)
Double Bituminous Surface Treatment (DBST), Rut Cutting, Filling, Road Marking & Reflecting Road Studs Work at Ch. 22+350m to 56+500m and Construction of RCC 'U' Drain, Cross Drain, Saucer Drain at 57th Km (p) (Joina) of Dhaka (Banani)-Joydebpur-Mymensingh (N-3) Road under Gazipur Road Division during the year 2020-2021. (PMP(Road) 2020-2021).
44. Contract No: DZ(e-GP)/06-Contract/PMP(Road)/2020-2021(TID-494901)
DBS Wearing Course including profile correction by Premix Bituminous Carpeting and Steel Pipe Drain at Ch. 0+000km to 0+200km, 5+700km to 6+400km, 6+600km to 10+640km of Dhaka-Narayangonj (Postogola-Chashara) Road (R-810) and Rigid Pavement & DBST Work of Keranigonj (Konakhola)-Kholamora-Hazratpur-Itavara (Z8002)Road (Ch. 0+000 to 23+500),Widening of Bridge Approach and DBST work including U Drain construction at Bosila Bridge Approach road (Z 8208)(Ch. 0+000 to 5+220) and DBST work at 1st km of R 504 to Harindhara Link (Z 5044)(Ch. 0+000 to 1+000) under Dhaka Road Division During the year 2020-2021. (PMP(Road) 2020-2021).
45. Contract No: MZ(e-GP)-08/PMP(Road)/2020-2021(ID#493590)
Periodic Maintenance Programme by providing engthening, DBS Base Course & DBS-Wearing Course work from Ch.3.700 Km to Ch.6.450 Km, Ch.6.850 Km to Ch.10.600 Km & Ch.10.800 Km to Ch.12.790 km of Mymensingh Town Bypass Road (N-309) and Ch.0.000 Km to 1.010 Km of Churkhai Bazar Link Road (N-303) under Road Division Mymensingh during the year 2020-2021
46. Contract No: e-GP-183/DEV/EE/BRD/2020-2021 WP-01 (Tender ID No. 476257)
Earth Work, Rigid pavement (Ch: 0+000 to 3+000m), Drain Sign Signal, Km post, Road Marking & General Site Facilities of Bogura-Sariakandi (Z-5032) Road, under Road Division Bogura, during the year 2019-2020 (WP-01).
47. Contract No: 01/e-GP/PMP-Road Major/BZ/Bari/2021-2022 , (Tender ID: 600912 )
Surfacing work by Providing DBS-Base Course & DBS-Wearing Course from Ch. 161+100 to 165+900 and Ch. 176+068 to 183+800 of Dhaka (Jatrabari)-Mawa-Bhanga-Barishal-Patuakhali Road (N-8) under Barishal Road Division during the year 2021-2022
48. Contract No:02/e-GP/PMP-Road Major/BZ /Pir/2021-2022 , (Tender ID: 600933 )
Maintenance work by (i) Aggregate Base Type-1 with DBS Wearing Course From Ch 22+313 (Kuniary Sawrupkath) to 42+155 (Naikathi More) km of Goriarpar-Banaripara-Sarshina-Sawrupkathi-Kawkhali-Naikathi Road (Z-8033) (ii)DBS Wearing Course From Ch.: 39+460m (Mohishpura) to 42+802m (C.O Office Mor) km of Noapara-Bagerhat-Pirojpur Regional Highways (R-770) (Pirojpur Portion) and (iii) Aggregate Base Type-1 with DBS Wearing CourseCh 8+587 (Shealkhaki) to 10+670 (Natun Bazar) km & Ch. 12+900 (Kumirmara) to 14+650 (Ranipur Mor) of Rajapur-Naikati-Bekutia-Pirojpur Road (Z-8702) (Pirojpur Portion). under Pirojpur Road Division, during the year 2021-2022
49. Contract No: eGP-02/RHD/ACE/RZ/2021-2022. (TID- 604276)
Periodic Maintenance Program (PMP) for Construction of Hard Shoulder at 425th(P), 426th(P), 427th(P), 428th(P), 429th(P), 430th(P), 431st(P), 432nd(P), 439th(P), 440th(P) Km of Dhaka ( Mirpur) -Utholi-Paturia- Natakhola-Kashinathpur- Bogra-Rangpur-Beldanga-Banglabandha (N-5) Road under Road Division, Thakurgaon during the year 2021-2022.
50. Contract No: 03/e-GP/Rev/RZ/2021-2022. (TID-604469)
Periodic Maintenance works under PMP-Major(Road) providing Aggregate Base Type-I, DBS Wearing Course and Rigid Pavement from Ch. 7+880 to Ch. 18+720 km of Bonpara-Gopalpur-Lalpur Road (Z 6014) under Natore Road Division during the year 2021-2022. (OTBL-RBL)
51. Providing DBS-Wearing Course, Repair of potholes & earthwork from Ch. 29+000 to 39+000 and Construction of Rigid Pavement from Ch. 27+336 km. & Ch. 27+556 of Bakerganj-Padrishibpur-Kathaltali-Subidkhali-Barguna Road (Z-8810) (2) Providing DBS-Wearing Course including necessary repair and earthwork from Ch. 5+400 to 10+340 km. of Binapani-Kachua-Betagi-Mirjaganj-Patuakhali Road (Z-8052) under Barguna Road Division during the year 2021-2022.(3)Construction of 4 Lane Highway of Patuakhali town Portion of the Binapani-Kachua-Betagi-Mirjaganj-Patuakhali Road (Z-8052) at (Ch. 25+993 to 26+789 ) under Patuakhali Road Division During the year 2021-2022
52. Periodic Maintenance Programme for Double Bituminous Surface Treatment (DBST) & Construction of Rigid Pavement (Shikarikanda Round About) from Ch. 56+500m to 106+545m of Dhaka (Banani)-Joydebpur-Mymensingh Road (N-3) under Mymensingh Road Division during the year 2021-2022.
53. Contract No: eGP-01/RHD/ACE/RZ/2021-2022 (TID-601986)
Periodic Maintenance Program (PMP) with DBST work including repairing & earth work at Ch. 18+600 to 35+000 Km of Mithapukur-Shahebganj-Madhyapara-Phulbari (R-556) (Dinajpur part) Road, at Ch. 0+000 to 4+440 Km of Moheshpur-Barapukuria (R-558) Dinajpur-Road, at Ch. 1+182 to 9+932 Km of Phulbari-Parbatipur (Z-5857) Road, at Ch. 0+000 to 2+950 Km of Parbotipur By-Pass (Z-5026) Road & Ch. 4+345 to 12+700 Km of Saidpur-Parbatipur Road (Z-5011) (Dinajpur Part) under Road Division, Dinajpur, during the year 2021-2022. (Masud-Hasan-RBL)
54. Contract No: 01/e-GP/Rev/RZ/2021-2022 (TID-601855)
Periodic Maintenance works under PMP-Major (Road) at Ch. 100+040 to 127+500 of Dhaka(Mirpur)-Utholi-Paturia-Natakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Banglabandh Road (N-5) and Ch. 0+000 to 2+310 of Baderhat-Kazirhat (Latifpur) Road (N-505) under Pabna Road Division during the year 2021-2022. (Masud-RBL)
55. Contract No: Drc(e-GP)07/ Dev/2019-2020 (TID- 395622 )
Construction of Dedicated Service lane, Bus Bay, Footover Bridge, Footpath New Jersey Barrier, Bialy Bridge , Construction of drain , Protective work and Surfacing on existing pavement at Mohadebpur & Barangail of Dhaka (Mirpur)-Utholi-Natakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Banglabandha (N-5) under Manikganj Road Division during the year 2019-2020. (WP-09) (M/S S M Construction , Md. Mahfug Khan Ltd , RBL)
56. Contract No: Drc(e-GP)11/ Dev/2019-2020 (TID- 410600 )
Construction of Dedicated Service lane, Bus-Bay, Footpath, Footover bridge, New Jersey Barrier, Construction of Drain and Lighting work at Manikganj Bus Stand of Dhaka (Mirpur)-Utholi-Natakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Banglabandha (N-5) Road under Manikganj Road Division during the year 2019-2020 (WP- 07). (M/S Kohinur Enterprise , Md. Mahfug Khan Ltd , RBL)
57. Contract No: Drc(e-GP)12/ Dev/2019-2020 (TID- 400983)
Construction of dedicated service lane From Islampur to Snowtex, Bus Bay, 3nos Footover Bridge, New Jersey Barrier, U-Loop, 01 (One) nos RCC Box Culvert, 01 (One) nos RCC Bridge, Surfacing on existing Pavement at Ch. 25+760m to 28+030m of Dhaka (Mirpur)-Utholi-Natakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Banglabandha (N-5) under Manikganj Road Division during the year 2019-2020.(WP-2) (RBL , Md. Mahfug Khan Ltd , )
58. Contract No: 04/e-GP/Rev/RZ/2021-2022. (TID- 605798)
PMP (Road - Major) works providing 40mm DBS wearing course including Aggregate Base Type-I, Protective Work etc. from Ch: 8+200 (Shibganj Bazar) to 23+500 (Manda Ferry Ghat ) = 15.300 K.M. of Enayetpur- Mohadevpur-Patakhatahat-Manda (Z-5463) Road under Road Division ,Naogaon during the year-2021-2022. (RBL )
59. Contract No:MZ/e-GP/02/PMP-Road-Jam/2021-2022 (TID- 605553)
Periodic Maintenance Program by Providing DBS Wearing Course, Construction of Rigid Pavement & RCC Drain and Protective work from Ch. 00+000 km to 10+120 km of Jamalpur-Madarganj Road (R-461) under Jamalpur Road Division during the year 2021-2022. (RBL )
60. Contract No:MZ/e-GP/06/PMP-Road-Tan/2021-2022 (TID-606129)
DBS Wearing Course, Widening, Strengthening by Aggregate Base Type-I, Partial Raising, Rigid Pavement & Protective work of Kalihati-Ratangang-Shakipur Road (Z-4016) at Ch: 09+300 to 22+865 & Link Bollah Bazar Road Ch: 00+000 to 03+000 under Tangail Road Division during the year 2021-2022. (RBL )
61. Contract No:eGP-04/RHD/ACE/RZ/2021-2022 (TID- 604409)
Periodic Maintenance Program (PMP) with Rigid Pavement at Ch. 22+470 Km to 22+670 Km (Aditmari Bazar), Ch. 22+800 Km to 23+040 Km (Aditmari Rail station) Ch. 47+630 Km to 47+830Km (Vullarhat Bazar), Ch. 56+600 Km to 56+950 Km (Parulia Bazar), Ch. 60+500 Km to 60+650 Km (Petrol pump Bazar), Ch. 72+200 to 72+800 Km (Borokhata Bazar), Ch. 79+400 Km to 79+800 Km (Boura Bazar) and strengthening work at Ch. 27+750 Km to Ch. 28+050Km, Ch, 29+000 Km to 30+000 Km and DBS-wearing Course at Ch. 23+000 to 28+400 Km (Tulun Bazar), Ch. 29+400 Km to 30+000 Km (Palashi Grave Yand) (Deduction 37 m) of Barabari-Lalmonirhat-Burimari National Highway (N-509) under Road Division, Lalmonirhat during the year 2021-2022. (RBL )
62. Contract No:DZ(e-GP)10-Contract/Dev/2020-2021(TID-528872)
Construction of 187.18m long (5x36.58 m) PC Girder bridge (Chapai Bridge) at 31th km of Mawna-Fulbaria-Kaliakoir-Dhamrai Road (R-315) Under Gazipur Road Division During the Year 2020-2021(Wp-09) (M.M. BUILDERS & ENGINEERS LTD - RBL )
63. Contract No:MZ(e-GP)-06/Dev(MC)/2020-2021(ID#456060)
Earth work, New Flexible pavement, 16Nos RCC Box Culvert, Protective work, Sign Signal, KM Post at Ch. 0+000m to Ch. 20+500m of Border Road (Z-2834) (Netrakona Portion) under Netrakona Road Division during the year 2018-2019 [PW-01] (MM Basi - RBL )
64. Construction of Hard Shoulder (Ch:3+400 to 43+000m), Culvert(18m), Rigid Pavement, Drain,Protective Work,Sign Signal,Km post,Road Marking & Genaral Site Facilities of Bogura-Naogaon-Mohadevpur-Patnitala-Dhamoirhat-Joypurhat (R-545) Road,under Road Division Bogura, during the year 2019-2020.Under Road Division,Bogura. (WP-11)
65. Earthwork widening strengthening New flexible pavement surfacing construction of RCC Box culvert Drain Protective work Sign signal KM post and road marking work at Ch3000 km to Ch12500 km of Bogura-Sariakandi Zilla Highway Z-5032 under Road division Bogura during FY 2020-2021 (WP-02)

Equipment List

Sl No. Equipments Quantity
1. Asphalt Batching Plant 06 Nos.
2. Asphalt Hot Mix Plant 06 Nos.
3. Paver Finisher 08 Nos.
4. Bitumen Distributor 12 Nos.
5. Tandem Vibratory Roller 18 Nos.
6. Road Roller 20 Nos.
7. Pneumatic Tire Roller 17 Nos.
8. Excavator 30 Nos.
9. Soil Compactor 18 Nos.
10. Air Compressor 20 Nos.
11. Motor Grader 28 Nos.
12. 17 Nos. 17 Nos.
13. Chips Spreader 17 Nos.
14. Store Crushing Plant 12 Nos.
15. Road Marking 15 No.
16. Dump Truck 150 Nos.
17. Generator 30 Nos.
18. Milling Machine 03 Nos.
19. Water Tanker 90 Nos.
20. Water Pump 50 Nos.
21. Mixture Machine 25 Nos.
22. Bitumen Decanter 15 Nos.
23. Core Cutter 15 Nos.
24. Plate Compactor 25 Nos.
25. High Pressure Water Cleaner 10 Nos.
26. Self Loader 13 Nos.
27. Hino Prime-over 13 Nos.
28. Hino Cement Tanker 06 Nos.
29. Grove Crane 5 No.
30. Motor Cycle 62 Nos.
31. Welding Set 20 Set.
32. Fuel Tank 15 Set.
33. Survey Equipment 30 Set.
34. Winch machine 10 Set.
35. Piling Rig Bridge Equipments 15 Set.

Reliable Machinaries

  • corporate profile
  • Vision
  • Mission
  • Activities
  • I take pride in preparatory of the prominent mechanical engineering solutions and construction firms in Bangladesh, having achieved remarkable growth over the years and contributing significantly to the development of National Infrastructure. The Reliable Builders & Reliable Machineries has attained prominence as a leader in the field of construction and engineering through competence, competitiveness and timely delivery with highest quality standards and recognized safety performance. We have a long tradition of serving our valued customers to their complete satisfaction through efficient management and excellent workmanship, which we continue to maintain with our untiring efforts.

    In an era of advanced technologies and new techniques, we continuously strive for innovation and enhanced efficiency.

    Offering services spanning a wide range of engineering fields in oil & gas, sewage systems, marine structures, building constructions, power & water, roads & bridges and industrial and civil infrastructure, TRB & RM are the preferred choice of many clients because of its reliability and commitment to quality and safety.

    Due to strong background in Mechanical Engineering Solutions & design, TRB & RM have been able to succeed in the projects by prioritizing our engineering notion. Whereby, the “corporate synergy” built together with our mother company OTBL and Partnership Corporation (DEWL) had a major contribution on our success. We never failed to realize that our efficient structure has always been the most significant anchorage for our Clients. As we look to the years ahead we renew our pledge to remain committed to excellence, keep abreast of changes and innovations, adopt better management and construction techniques and successfully overcome all challenges before us.

    Shafiqul Alam Mithun
    Proprietor
    Reliable Machineries

  • From being number one construction company in Bangladesh, TRB & RM continues to excel in its entire field through its leadership skills. It makes its mark in South East Asia delivering projects that consistently meet international standards.

  • With a well-defined direction in place, the path to realizing our Vision is based on fundamental drivers, instrumental in achieving our goals. Industrialization is a process that happens in countries when they start to use machines to do work that was once done by traditional labor. Industries are the most important aspect of the economy. Using better technology, it becomes possible to generate more possessions in a shorter amount of time. Sectors such as Agriculture, Energy, Transportation, Material Handling, Heavy Duty Machineries, Electric Appliances, Textile and etc; are the versatile parts of International Trading.

    On the other hand, Road infrastructure is vital in assisting the Nation’s economic development by moving people and goods. Sectors such as Civil Construction particularly roads, buildings, airport, power and ports have become very attractive for both domestic and foreign contractor & investors. This is due to relatively low entry barriers in these markets, a strong project pipeline and a considerable opportunity size.

    As a result, the market as a whole has become a mixed bag of opportunities in which different types of players are participating, concerning the common interest of doing business. Orienting towards market demand, THE RELIABLE BUILDERS (TRB) & RELIABLE MACHINERIES (RM) are the most imperative Sister Concerns of OTBL. Facing the new challenges and opportunities, TRB & RM has emerged as a leading enterprise in Bangladesh in the field of Infrastructure construction & International trading of Industrial Machineries.

    The Reliable Builders has been a key partner in the infrastructure growth of BANGLADESH, since the company’s founding TRB has explored & expanded to meet the needs of the region as the demands for improved infrastructure increase. As The Company grown, TRB has formed & pursue new partnerships and branched out to new subsidiaries to meet nearly every Industrial Machinery of Transportation, Construction, Material Handling, Marin, Textile, Agriculture & a wide variety of products and services under the company Reliable Machineries (RM). RM prides itself as a major player in the Industrial Machinery, not only for its quality products, but also for its high company standards of safety and performance with Engineering Workshops for ensured After Sales Service. RM’s success is based on a foundation of exceptional accomplishments, with an eye on Mechanical innovation for the future.

  • The construction work involves earthworks, foundation works, piling and foundation reinforcement, tunneling and underground construction, harbor construction and dredging, municipal engineering, and the construction of streets, roads, bridges and Street light facilities etc. In infrastructure maintenance, our company is involved in up keeping roads, streets and the rail network, including related structures such as bridges. We offer long-term maintenance agreements where pricing is influenced by the usability of the route and service quality.

    RM will continue on its path of pursuing growth in high margin growth oriented sectors, particularly in the Industrial Machinery regarding Construction, Agriculture, Material Handling & Vehicles and power sectors where a supply capacity crunch is anticipated with the pressures brought on by the rise in regional demand. We have earmarked a strong focus on improving client service and relations, as well as increase investment and empower high margin businesses to drive sustainable and long term growth.

    To procure projects at competitive pricing, provide safe working condition and deliver quality work within reasonable time frame the advantages of hiring TRB for your special projects include:

    • Single point of contact for all aspects of civil construction

    • Rapid response and mobilization

    • Big-picture understanding of ongoing business environments

    • Well-defined scopes of work

    • Quick response to change

    • 100% Quality
    Selected areas where RM can help:

    • Product profitability: Striking the right balance across go-to-market strategy, option profitability, cost structure, discount strategy, and product mix.
    • Global launches: Effectively launching the same platform or product in multiple regions through a combination of local and global suppliers.
    • Cost engineering: Delivering both value and insight in the face of the dual challenges of elaborate global complexity and low volumes.
    • Relationships between suppliers and original equipment manufacturers: Targeting and executing the right mix of local and global relationships to jointly develop and profitably deliver products globally.
    • Technical cost reduction: Implementing major programs across geographies to reduce direct material costs on current products.
    • Functional assessments and redesign: Assessing organizations’ current capabilities and developing road maps to sustainably achieve best-in-class performance.

    To us, “Excellence” means not only being the very best at what we do, but also holding ourselves to the highest ethical standards in terms of how we do things. That is why we must never deviate from our Business Principles, regardless of the difficulties or consequences. As we strive for Excellence, we must continue to earn the trust of our customers, employees, local communities and co-workers by continuously demonstrating that we are worthy of the trust that they have placed in us.

Contact Us

Please enter your name.
Please enter your valid E-mail ID.
Please enter your phone number.
Please enter your message.

Your message has been sent successfully.
Sorry, error occured this time sending your message.

Head Office

House: 12, Road: 53,
Gulshan 2, Dhaka-1212
Tel:88-02-9882018,8835692 IP:09639222777, 09614500750 Fax:88-02-9882018 Email:reliablebuildersltd19@gmail.com